GAC Dubai is installing over 15,000 high-efficiency solar panels to generate electricity for two of its contract logistics facilities, with approximately 3.42 megawatts of solar capacity being fitted at GAC Logistics Park in Jafza, covering 73 per cent of its total electricity needs.
GAC has appointed Total Solar Middle East to fit the SunPower® P19-series solar panels, and is also looking into installing solar panels at its other warehouses in Jafza. The project is linked to Shams Dubai, the first smart initiative by Dubai Electricity and Water Authority (DEWA), which connects solar energy to households and businesses.